| Check Point | Compliant | Remarks |
|---|---|---|
| Correct routing as per plan/drawing | ||
| Bend radius within acceptable limits | ||
| No physical damage to cable jacket | ||
| Proper support & spacing between supports | ||
| Separation from power cables | ||
| Earthing / Grounding as required | ||
| Labeling and identification | ||
| Cable entry/exit points sealed |