Telecom Equipment Grounding Inspection Form
Date of Inspection
Location
Inspector Name
Department
Inspection Item
Pass
Fail
Comments
Grounding conductor properly installed
Connection to main ground bar secure
Grounding lugs tightly fastened
No corrosion on grounding points
Equipment rack bonded to ground
Additional Comments
Inspector Signature
Date