Telecom Rack Cabinet Transfer Checklist

Date:
Rack Cabinet ID/Label:
Location (From):
Location (To):
Pre-Transfer Inspection
Item Check Initials Remarks
Verify equipment inventory in cabinet
Label all devices & cables
Backup configuration/data (if needed)
Power down equipment safely
Remove peripherals (if applicable)
Physical Transfer
Item Check Initials Remarks
Secure all cabinet doors and panels
Ensure cabinet is stable for transport
Monitor environmental conditions (humidity/temp)
Check for damages post-transfer
Post-Transfer Setup
Item Check Initials Remarks
Position and secure cabinet in new location
Reconnect cables as per labels
Power up equipment
Perform operational check
Update equipment inventory records
Additional Notes
Transferred By
Received By
Date