Wind Turbine Foundation Installation Inspection

General Preparation

Item Status Comments
Site access and safety measures in place
Foundation layout and dimensions checked

Excavation

Item Status Comments
Excavation depth and width as per drawing
Bottom surface level and free from loose material

Reinforcement

Item Status Comments
Bar size, spacing, and placement as per design
Reinforcement clean and free from rust/oil

Anchor Bolt Installation

Item Status Comments
Bolt type, size, and arrangement checked
Bolt position, alignment, and level correct

Concreting

Item Status Comments
Mix design and slump as per specification
Concrete placement and compaction compelete

Curing and Finishing

Item Status Comments
Curing procedure initiated in time
Finished surface as required

Remarks