| Project Name | Date | ||
|---|---|---|---|
| Location | Team Leader |
| # | Checklist Item | Completed | Remarks |
|---|---|---|---|
| 1 | Verify project drawings and route survey | ||
| 2 | Obtain required permits and clearances | ||
| 3 | Inspect cable drums and accessories | ||
| 4 | Check trench dimensions / duct alignment | ||
| 5 | Ensure proper cable pulling methods applied | ||
| 6 | Protect cable at crossings and vulnerable points | ||
| 7 | Mark cable route and provide warning tapes | ||
| 8 | Check jointing and splicing arrangements | ||
| 9 | Test cable after laying | ||
| 10 | Backfill trenches and restore site |
| Supervisor | Date | ||
|---|---|---|---|
| Inspector | Date |