Data Center Rack Installation Checklist
Pre-Installation
Site prepared and cleared
Power availability verified
Rack space measured and confirmed
Floor load capacity checked
Tools and hardware ready
Rack Installation
Rack positioned and leveled
Rack anchored as required
Earthing provided
Adequate cable access/openings
Blanking panels installed
Post-Installation
Labels attached for rack/unit numbers
Area cleaned up
Final inspection completed
Documentation updated
Notes
Date
Technician
Notes