Elevator Installation Site Readiness Checklist

Project & Site Details
Project Name Date
Site Address Prepared By
Checklist
Status Item Comments
Pit is clean and dry
Pit ladder installed
Temporary light with switch in pit
Power supply available in machine room/control room
Elevator shaft is free of debris and obstructions
Shaft doors installed/secured
Entry to site/building is accessible
Machine room floor finished and clean
Machine room ventilated and illuminated
Hoistway and overhead are dry and watertight
Scaffolding or working platform in place, if needed
Required building permits posted
Additional Notes