Telecom Tower Equipment Installation Checklist
Site Name/ID
Date
Technician Name(s)
Pre-Installation
Site access permission acquired
Equipment received and verified
Tools and safety gear inspected
Power supply checked
Installation
Tower grounding completed
Mounting brackets securely installed
Antennas installed as per plan
Cable routed and secured
All connectors tightened and taped
Earthing connections done
Post-Installation
Equipment powered on and tested
VSWR measured
Site photos taken
Site area cleaned
Comments / Notes
Technician Signature
Time Completed