Solar Panel Installation Quality Control Checklist

Project Information
Project Name
Location
Date
Installer
Inspector
Checklist
Item Pass Fail Notes
Panels installed according to design layout
Mounting hardware securely fastened
Wiring neatly arranged and secured
Correct tilt and orientation
No shading on panels during peak sun hours
All connectors properly attached and tightened
Grounding and bonding are complete
Inverter installed and operational
Warning labels and signage installed
Site cleaned and all debris removed
Additional Comments
Inspector Signature
Date
Installer Signature
Date