HVAC System Installation Checklist
Project Name
Site Address
Client Name
Installation Date
Checklist
Equipment Delivered and Inspected
Mounting Location Verified
Ductwork Installed Correctly
Electrical Connections Completed
Thermostat Installed
Condensate Drain Checked
Refrigerant Lines Pressure Tested
System Started and Tested
Operating Instructions Provided
Site Cleaned Up
Additional Notes
Technician Name
Technician Signature