| Item |
Comments/Notes |
Verified |
| Project Details (Project Name, Location, Designer) |
|
|
| Design Drawings Complete & Reviewed |
|
|
| System Type Selected (e.g., VRF, Chilled Water, DX, etc.) |
|
|
| Outdoor and Indoor Conditions Defined |
|
|
| Load Calculations Completed (Heating/Cooling) |
|
|
| Ductwork and Piping Layout Verified |
|
|
| Equipment Selection Review (AHU, FCU, Pumps, etc.) |
|
|
| Control System Arrangements & Points Listed |
|
|
| Fresh Air & Ventilation Compliance |
|
|
| Energy Efficiency Standards Checked |
|
|
| Noise and Vibration Attenuation Considered |
|
|
| Space for Maintenance/Access Verified |
|
|
| Schematics & Schedules Updated |
|
|
| Specification Compliance |
|
|