Site Inspection Non-Conformance Report
Report No.
Date
Project Name
Location
Inspected By
Contractor
Details of Non-Conformance
Description
Reference Drawing/Spec
Location of NC
Date Identified
Action Required / Immediate Measures
Proposed Action
Root Cause Analysis
Root Cause
Corrective / Preventive Action
Details
Responsible Person
Target Date
Follow-up & Verification
Status
Date Verified
Verified By
Remarks