Solar Panel Installation Checklist
Site Assessment
Roof structure inspected
Shading analysis completed
Roof orientation and tilt verified
Site measurements taken
Permits & Documentation
Electrical permit obtained
Building permit obtained
Utility approval received
Installation plan reviewed
Material Check
Panels received and inspected
Inverter ready
Mounting hardware prepared
Cabling and connectors available
Installation
Safety equipment in use
Mounting system installed
Panels fixed securely
Wiring completed
Inverter installed
Grounding completed
Testing & Commissioning
System inspection performed
Electrical connections checked
System test completed
Monitoring setup
Handover
Documentation provided
System user training
Maintenance details explained