Structural Engineering Handover Checklist
Project Name:
Project Number/Reference:
Location:
Date of Handover:
Structural Engineer:
Contractor:
General Documentation
| Item |
Checked |
Comments |
| As-built Structural Drawings |
|
|
| Design Calculations |
|
|
| Structural Specifications |
|
|
| Materials Certificates |
|
|
| Load Test Reports |
|
|
| Inspection & Test Records |
|
|
Site Inspection
| Item |
Checked |
Comments |
| All Structural Members Visible and Accessible |
|
|
| No Damage, Cracks or Settlement Observed |
|
|
| Bolt Tightening/Torquing Completed |
|
|
| Grouting Completed |
|
|
| Fire Protection Provided (if required) |
|
|
Certificates & Approvals
| Item |
Checked |
Comments |
| Completion Certificate |
|
|
| Regulatory Approvals |
|
|
| Non-Destructive Test Certificates |
|
|
| Quality Assurance Reports |
|
|
Outstanding Items / Snag List
| Description |
Responsible Party |
Target Completion Date |
Status |
|
|
|
|
|
|
|
|