Structural Engineering Handover Checklist

Project Name:
Project Number/Reference:
Location:
Date of Handover:
Structural Engineer:
Contractor:
General Documentation
Item Checked Comments
As-built Structural Drawings
Design Calculations
Structural Specifications
Materials Certificates
Load Test Reports
Inspection & Test Records
Site Inspection
Item Checked Comments
All Structural Members Visible and Accessible
No Damage, Cracks or Settlement Observed
Bolt Tightening/Torquing Completed
Grouting Completed
Fire Protection Provided (if required)
Certificates & Approvals
Item Checked Comments
Completion Certificate
Regulatory Approvals
Non-Destructive Test Certificates
Quality Assurance Reports
Outstanding Items / Snag List
Description Responsible Party Target Completion Date Status