Construction Material Non-Conformance Report Form
Project Name
Report No.
Date
Location
Material Description
Supplier / Manufacturer
Reference Documents (Drawing / Spec / PO)
Nature of Non-Conformance
Quantity Involved
Discovered By
Date of Discovery
Description of Non-Conformance
Recommended Disposition
Use As Is
Rework / Repair
Replace
Other
Corrective / Preventive Action
QA/QC Name
Signature
Date
Project Manager Name
Signature
Date