Pipeline Welding Non-Conformance Report

Basic Information
Report No. Date
Project Name Location
Pipeline Section Drawing Number
Details of Non-Conformance
Weld/Joint No.
Description of Non-Conformance
Location (Chainage/KP)
Date Detected
How Detected
Immediate Action Taken
Action Details
Root Cause Analysis
Root Cause
Corrective/Preventive Action
Corrective Action
Preventive Action
Verification
Verified By Date
Remarks
Prepared By
Reviewed By
Approved By