Electrical Engineering NCR
Project Name:
NCR Number:
Date:
Location:
Reference Drawings/Docs:
Inspector:
Description of Non-Conformance
Details
Description
Observed By
Date Observed
Proposed Disposition
Corrective Action(s)/Remarks
Proposed By:
Reviewed By:
Approved By:
Date:
Date:
Date: