| Project Name | |
|---|---|
| Location | |
| Date | |
| Commissioned By |
| Equipment Type | |
|---|---|
| Manufacturer | |
| Model Number | |
| Serial Number | |
| Installed By |
| Item | Complete | Comments |
|---|---|---|
| Verify equipment installation and location | ||
| Check electrical connections and controls | ||
| Inspect ductwork for leaks and insulation | ||
| Confirm air filter installation | ||
| Calibrate thermostats and control systems | ||
| Test start-up and shutdown procedures | ||
| Verify airflow and temperature at diffusers/registers | ||
| Check refrigerant charge and lines (if applicable) | ||
| Test safety and alarm systems | ||
| Record operating parameters | ||
| Provide documentation and user training |
| Name | Title | Date | Signature |
|---|---|---|---|