Post-Tensioning Concrete Inspection Template
Project Information
Project Name
Project Location
Date of Inspection
Inspector Name
Post-Tensioning System Details
Type of System
Cable/Strand Type
Number of Tendons
Drawings/Specs Reviewed
Inspection Checklist
Checklist Item
Yes
No
Comments
Tendons correctly positioned per drawings
Anchorage zones free of debris
Ducts/Sheathing undamaged and continuous
Proper concrete cover maintained
Stressing operations in accordance with procedures
Observed Issues & Comments
Sign Off
Inspector Signature
Date