| Item | Yes | No | N/A | Remarks |
|---|---|---|---|---|
| Weather conditions suitable for paving | ||||
| Traffic control in place and effective |
| Item | Yes | No | N/A | Remarks |
|---|---|---|---|---|
| Base/sub-base condition appropriate | ||||
| Surface cleaned and free of debris | ||||
| Tack coat applied (if required) |
| Item | Yes | No | N/A | Remarks |
|---|---|---|---|---|
| Asphalt mix delivered at correct temperature | ||||
| Asphalt mix type as specified | ||||
| No segregation or contamination of mix |
| Item | Yes | No | N/A | Remarks |
|---|---|---|---|---|
| Paving equipment in proper working condition | ||||
| Correct paving thickness and width | ||||
| Uniform surface without visible defects |
| Item | Yes | No | N/A | Remarks |
|---|---|---|---|---|
| Rollers in good condition and properly operated | ||||
| Compaction temperature within specified range | ||||
| Number of passes as specified |
| Item | Yes | No | N/A | Remarks |
|---|---|---|---|---|
| Compaction test performed | ||||
| Density meets specifications | ||||
| Surface smoothness checked |