Data Center Power Utilization Audit Form
Data Center Name
Location
Date of Audit
Auditor Name
Total Installed IT Load (kW)
Total Measured IT Load (kW)
Total Facility Power Consumption (kW)
Power Usage Effectiveness (PUE)
UPS Type & Capacity
Average UPS Loading (%)
Generator Capacity
Cooling Infrastructure Description
Observations
Improvement Recommendations