HVAC Installation Regulatory Compliance Checklist
Permits & Documentation
Permit application submitted
Permit approved and on-site
Manufacturer installation instructions available
Inspection records filed
Equipment & Materials
Equipment matches approved plans
Materials meet local code requirements
Proper labeling of all equipment
Installation Standards
All work performed by licensed professionals
Ductwork sealed and insulated
Clearances per code maintained
Electrical & Gas Compliance
Electrical connections comply with code
Grounding and bonding verifed
Gas lines pressure tested
Shut-off valves installed and labeled
Ventilation & Exhaust
Ventilation ducts correctly routed
Combustion air supply in place
Exhaust terminations meet code
System Start-up & Testing
System performance validated
Safety controls tested
Thermostat operation checked
Final Inspection
Final inspection scheduled
Inspector approval received
Documentation filed with local authority
Notes: