Solar Battery Bank Installation Checklist
Pre-Installation
Site assessed for suitability
Load calculation completed
Permits and approvals obtained
All equipment and materials checked and available
Installation
Battery location/foundation prepared
Cabling and conduit installed
Solar battery bank securely mounted and fixed
Ventilation and safe spacing ensured
DC wiring connected (correct polarity checked)
Safety devices (fuses, disconnects) installed
Labels and signage applied
Commissioning
System and connections checked for faults
Initial charge (as per manufacturer’s guidelines) performed
Monitoring system tested
Documentation and diagrams completed
User instructed on operation and safety