| Checklist Item | Yes | No | Remarks | |
|---|---|---|---|---|
| 1 | Site location verified and accessible | |||
| 2 | Roof structural integrity checked | |||
| 3 | Mounting structure aligned as per layout | |||
| 4 | Structure material and coating as per specification | |||
| 5 | Anchoring/fastening done securely | |||
| 6 | Waterproofing around fasteners | |||
| 7 | Appropriate tilt angle provided | |||
| 8 | Array layout follows electrical and mechanical design | |||
| 9 | Clearance for module mounting ensured | |||
| 10 | No shading obstacles within the array area | |||
| 11 | Cable tray / conduit supports provided | |||