Residential Solar Installation Inspection Checklist
Project Information
Project Address
Installer Name
Date of Inspection
Inspector Name
1. General Installation
System location as per approved design
Array mounting structure secure and level
No visible damage to modules
Proper labeling in place (modules, disconnects, AC/DC points)
2. Electrical Checks
All electrical enclosures properly closed
No exposed wiring or open junction boxes
Correct wire sizing and color coding
Grounding and bonding confirmed
Correct voltages and polarities
3. Inverter and Disconnects
Inverter securely mounted
DC disconnect accessible and labeled
AC disconnect accessible and labeled
All inverters powered and operating properly
4. PV Array
Array wiring properly secured and protected
No shading or obstructions to modules
Module connections properly made
String VOC measurements within specifications
5. Final Comments / Notes
Inspector Notes