Elevator System Shop Drawing Review Checklist
Project Name:
Location:
Checked By:
Date:
1. General
| No. |
Item |
Reviewed |
Remarks |
| 1.1 |
Complete set of shop drawings submitted |
|
|
| 1.2 |
Drawings match contract and architectural plans |
|
|
| 1.3 |
All drawing titles, numbers, and revisions indicated |
|
|
| 1.4 |
Manufacturer and model clearly indicated |
|
|
2. Elevator Shaft and Pit
| No. |
Item |
Reviewed |
Remarks |
| 2.1 |
Shaft dimensions and clearances |
|
|
| 2.2 |
Pit depth, waterproofing, and sump provisions |
|
|
| 2.3 |
Hoistway ventilation and access |
|
|
| 2.4 |
Shoring, supports, slab thicknesses verified |
|
|
3. Car and Doors
| No. |
Item |
Reviewed |
Remarks |
| 3.1 |
Car dimensions and finishes |
|
|
| 3.2 |
Landing and car door types and sizes |
|
|
| 3.3 |
Clear opening verification |
|
|
| 3.4 |
Door protection devices (sensors, etc.) |
|
|
4. Machine Room / Control Room
| No. |
Item |
Reviewed |
Remarks |
| 4.1 |
Room location, size, headroom, and access |
|
|
| 4.2 |
Ventilation/louver details |
|
|
| 4.3 |
Fire protection measures |
|
|
| 4.4 |
Equipment layout and working space clearances |
|
|
5. Power and Communication
| No. |
Item |
Reviewed |
Remarks |
| 5.1 |
Power supply requirements and routing |
|
|
| 5.2 |
Emergency power and signage |
|
|
| 5.3 |
Communication systems (intercom, alarm) |
|
|
6. Safety and Compliance
| No. |
Item |
Reviewed |
Remarks |
| 6.1 |
Compliance with codes and standards |
|
|
| 6.2 |
Emergency access & egress details |
|
|
| 6.3 |
Safety signage and markings |
|
|
7. Other Comments
| Remarks / Action Required |
|
|
Reviewed by:
Signature:
Date: