Telecom Facility UPS System Handover Checklist

No. Checklist Item Completed Remarks
1 UPS installation physically complete
2 Cables and connections are properly secured
3 Input and output voltage verified
4 Bypass function tested
5 Alarm indicators checked
6 Battery condition and status checked
7 User manual and documentation provided
8 Site personnel trained for operation
Prepared by (Name & Signature) Date Received by (Name & Signature) Date