Generator Load Test Commissioning Checklist

Project Details
Project Name Date
Location Generator Model
Serial Number Rated Capacity
Pre-Test Checks
Item Checked Remarks
Fuel Level Checked
Oil Level Checked
Coolant Level Checked
Battery Condition Verified
All Connections Secure
Exhaust System Inspected
Load Test Procedure
Step Status Remarks
No Load Run (Warm-Up)
25% Load Applied
50% Load Applied
75% Load Applied
100% Load Applied
Return to No Load (Cool Down)
Observations & Measurements
Parameter Measured Value Remarks
Voltage (V)
Current (A)
Frequency (Hz)
Oil Pressure
Coolant Temperature
Noise Level
Comments
Technician Name & Signature
Engineer Name & Signature
Date