Generator Load Test Commissioning Checklist
Project Details
| Project Name |
|
Date |
|
| Location |
|
Generator Model |
|
| Serial Number |
|
Rated Capacity |
|
Pre-Test Checks
| Item |
Checked |
Remarks |
| Fuel Level Checked |
|
|
| Oil Level Checked |
|
|
| Coolant Level Checked |
|
|
| Battery Condition Verified |
|
|
| All Connections Secure |
|
|
| Exhaust System Inspected |
|
|
Load Test Procedure
| Step |
Status |
Remarks |
| No Load Run (Warm-Up) |
|
|
| 25% Load Applied |
|
|
| 50% Load Applied |
|
|
| 75% Load Applied |
|
|
| 100% Load Applied |
|
|
| Return to No Load (Cool Down) |
|
|
Observations & Measurements
| Parameter |
Measured Value |
Remarks |
| Voltage (V) |
|
|
| Current (A) |
|
|
| Frequency (Hz) |
|
|
| Oil Pressure |
|
|
| Coolant Temperature |
|
|
| Noise Level |
|
|
Comments
Technician Name & Signature
Engineer Name & Signature