| Item | Status | Comments |
|---|---|---|
| PV modules installed as per design | ||
| Mounting structure fixed and aligned | ||
| Cabling (DC/AC) completed | ||
| Inverter installed and connected | ||
| Earthing and lightning protection system completed | ||
| All DC/AC isolators in place | ||
| System voltage and polarity check | ||
| No loose connections or exposed wires | ||
| Labelling and signage complete | ||
| Monitoring system operational | ||
| Test run completed |