Chilled Water System Commissioning Checklist
| Project Name |
|
| Location |
|
| Date |
|
| Commissioned By |
|
1. Pre-Commissioning Checks
| # |
Check Item |
Complete |
Comments |
| 1.1 |
All pipework installed and visually inspected for leaks and damages |
|
|
| 1.2 |
Supports and hangers correctly installed |
|
|
| 1.3 |
Pipes flushed and cleaned |
|
|
| 1.4 |
Strainers and filters installed |
|
|
| 1.5 |
Valves installed and labeled |
|
|
2. Functional Checks
| # |
Check Item |
Complete |
Comments |
| 2.1 |
Pumps run tested in auto and manual modes |
|
|
| 2.2 |
Pump rotation direction correct |
|
|
| 2.3 |
Pump vibration and noise levels checked |
|
|
| 2.4 |
Expansion tank installed and functional |
|
|
| 2.5 |
Air vents operational |
|
|
3. Controls & Safety Devices
| # |
Check Item |
Complete |
Comments |
| 3.1 |
Control valves and actuators operate correctly |
|
|
| 3.2 |
All sensors calibrated and reading as expected |
|
|
| 3.3 |
Safety valves tested and working |
|
|
| 3.4 |
System pressure tested (normal and relief pressure) |
|
|
4. Final Commissioning
| # |
Check Item |
Complete |
Comments |
| 4.1 |
System performance testing completed (flow and temperature) |
|
|
| 4.2 |
Insulation installed properly |
|
|
| 4.3 |
As-built documentation provided |
|
|
| 4.4 |
Operation and maintenance manuals available |
|
|
| 4.5 |
Client training performed |
|
|
Remarks
Commissioning Engineer Signature: