| Project Name | |
|---|---|
| Date | |
| Location | |
| Inspector |
| Equipment | Status (Yes/No) | Comments |
|---|---|---|
| Power Distribution Units (PDUs) | ||
| UPS Systems | ||
| Cooling Units / CRAC | ||
| Fire Suppression System | ||
| Network Switches | ||
| Servers | ||
| Cabling / Wiring |
| Item | Completed | Notes |
|---|---|---|
| Visual Inspection Performed | ||
| Connections Verified | ||
| Labels and Tags Checked | ||
| Alarms / Indicators Checked | ||
| Documentation Complete |
| Name | Signature | Date |
|---|---|---|