| Physical Inspection (panel clean, undamaged) |
|
|
|
| Panel mounted securely |
|
|
|
| All terminations tight |
|
|
|
| Components labeled |
|
|
|
| Appropriate panel earthing |
|
|
|
| Wiring correct as per drawing |
|
|
|
| Insulation resistance test passed |
|
|
|
| Panel covers installed |
|
|
|
| Warning signs/stickers fitted |
|
|
|
| Tested on-load operation |
|
|
|