Telecom Tower Power System Handover Checklist





Checklist Items

Item Yes No Remarks
AC Power Supply functional
DG (Diesel Generator) operational
Battery Bank status checked
Rectifier operation verified
Mains/ATS changeover functional
Earthling system inspected
Cabinets and power cables intact
All alarms tested
Spare fuses available
Load test performed (if required)

Comments

Signatures

Name Role Date Signature