Data Center Handover Inspection and Acceptance
Project Information
Project Name:
Location:
Reference No.:
Date:
Inspected By:
Accepted By:
1. General Site Condition
| Item |
Status (Pass/Fail) |
Remarks |
| Cleanliness and free from debris |
|
|
| Access controls installed and operational |
|
|
| Flooring and structures |
|
|
2. Electrical Systems
| Item |
Status (Pass/Fail) |
Remarks |
| Main power supply |
|
|
| UPS / backup systems |
|
|
| Battery condition |
|
|
3. Cooling Systems
| Item |
Status (Pass/Fail) |
Remarks |
| CRAC/Precision air conditioning |
|
|
| Temperature and humidity control |
|
|
| Hot/cold aisle containment |
|
|
4. Fire Safety Systems
| Item |
Status (Pass/Fail) |
Remarks |
| Fire detection and alarm system |
|
|
| Fire suppression system |
|
|
| Fire extinguishers |
|
|
5. Network & Cabling
| Item |
Status (Pass/Fail) |
Remarks |
| Cable management |
|
|
| Labeling |
|
|
| Patching panels and racks |
|
|
6. Other Observations / Remarks
7. Items for Rectification
| Description |
Action Required |
Target Date |
Status |
|
|
|
|
|
|
|
|
Acceptance