Waterproofing Application Site Observation Report (SOR)
Project Name
Report Date
Report No.
Location
Area Observed
Observer/Inspector
Contractor / Applicator Details
Contractor Name
Supervisor Name
Contact Number
Materials Used
Material Description
Manufacturer
Batch/Lot No.
Quantity
Surface Preparation
Observations
Application Process
Type of Waterproofing System
Method of Application
Observations
Environmental Conditions
Ambient Temperature (°C)
Relative Humidity (%)
Weather Conditions
Testing/Inspection Results
Details
Non-Conformance / Issues Observed
Description
Location
Proposed Corrective Action
Comments / Recommendations
Name & Signature (Inspector)
Date