Fireproofing Site Observation Report (SOR) Form
Project Name
Project Location
Report Number
Date
Inspector Name
Contractor
Fireproofing Details
Type of Fireproofing Material
Area Observed
Specification Reference
Manufacturer
Application Method
Observation Data
Item
Description
Status
Remarks
Issues or Non-Conformances Observed
Actions Taken / Recommendations
Attachments (Drawing References, Photos, etc.)
Inspector Signature
Date
Contractor Representative Signature
Date