Renewable Energy Integration Inspection Checklist

Project Name: Date:
Location: Inspector:
1. Documentation
Item Yes No Remarks
System design and single-line diagrams available
All permits and approvals obtained
Operation and maintenance manuals provided
2. Equipment Inspection
Item Yes No Remarks
PV panels/wind turbines installed correctly
Inverters and controllers securely mounted
Wiring and connections properly labeled
Grounding and bonding properly installed
3. System Testing
Item Yes No Remarks
Insulation resistance test performed
Polarity and continuity verified
System startup and operation verified
Grid synchronization checked
4. Safety Compliance
Item Yes No Remarks
Warning labels and signage in place
Emergency disconnects accessible
PPE used during inspection
5. Integration and Communication
Item Yes No Remarks
Monitoring system operational
Data logging and reporting functional
Grid operator communication tested
Final Comments & Observations
Inspector Signature