Renewable Energy Integration Inspection Checklist
| Project Name: |
|
Date: |
|
| Location: |
|
Inspector: |
|
1. Documentation
| Item |
Yes |
No |
Remarks |
| System design and single-line diagrams available |
|
|
|
| All permits and approvals obtained |
|
|
|
| Operation and maintenance manuals provided |
|
|
|
2. Equipment Inspection
| Item |
Yes |
No |
Remarks |
| PV panels/wind turbines installed correctly |
|
|
|
| Inverters and controllers securely mounted |
|
|
|
| Wiring and connections properly labeled |
|
|
|
| Grounding and bonding properly installed |
|
|
|
3. System Testing
| Item |
Yes |
No |
Remarks |
| Insulation resistance test performed |
|
|
|
| Polarity and continuity verified |
|
|
|
| System startup and operation verified |
|
|
|
| Grid synchronization checked |
|
|
|
4. Safety Compliance
| Item |
Yes |
No |
Remarks |
| Warning labels and signage in place |
|
|
|
| Emergency disconnects accessible |
|
|
|
| PPE used during inspection |
|
|
|
5. Integration and Communication
| Item |
Yes |
No |
Remarks |
| Monitoring system operational |
|
|
|
| Data logging and reporting functional |
|
|
|
| Grid operator communication tested |
|
|
|
Final Comments & Observations
Inspector Signature