Structural Steel Asset Handover Checklist

Checklist Items
Item Check Remarks
1. Structural steel members installed as per drawings/specs
2. Welds visually inspected and approved
3. Bolted connections properly torqued
4. Corrosion protection (painting/galvanizing) completed
5. All identification markings in place
6. Punch list items resolved
7. As-built drawings submitted
8. QA/QC documentation handed over
Notes / Comments