Door Assembly Air Infiltration Test Report
Project Information
Project Name:
Project Address:
Report Number:
Date of Test:
Test Location:
Door Assembly Details
Manufacturer:
Model Number:
Door Type:
Material:
Size:
Glazing:
Operable Direction:
Hardware / Seals:
Test Standard
Standard / Method:
Test Pressure:
Instrument Used:
Calibration Date:
Test Results
| Test Pressure (Pa) |
Measured Air Leakage (m³/h) |
Door Area (m²) |
Air Infiltration (m³/h·m²) |
Acceptance Criteria |
|
|
|
|
|
Test Personnel
Tested By:
Witnessed By:
Reviewed By:
Date: