Hospitality Lighting Control Upgrade Inspection Sheet

Project Information
Room / Area Information
Inspection Checklist
Item Pass Fail Comments
Control devices installed per design
All fixtures respond to controls
Scene & schedule programming verified
Wiring/neatness/labeling as required
User interfaces tested
Emergency/Egress lighting operates correctly
Local override tested
Deficiencies/Notes
Sign-Off