| Item | Pass | Fail | Comments |
|---|---|---|---|
| Control devices installed per design | |||
| All fixtures respond to controls | |||
| Scene & schedule programming verified | |||
| Wiring/neatness/labeling as required | |||
| User interfaces tested | |||
| Emergency/Egress lighting operates correctly | |||
| Local override tested |