Multi-Tenant Building Load Shaving Proposal
1. Project Overview
Building Name
Building Address
Proposal Date
Prepared By
2. Tenants Involved
Tenant Name
Contact
Floor/Unit
Load Contribution (kW)
3. Load Profile Analysis
Current Peak Load (kW)
Target Reduced Peak Load (kW)
Analysis Summary
4. Recommended Load Shaving Strategies
Strategy Description
Schedule/Implementation Plan
5. Expected Results & Benefits
Estimated Energy Savings (kWh)
Cost Savings ($)
Additional Benefits
6. Roles & Responsibilities
Stakeholder
Role
Responsibility
7. Approval
Decision Maker
Signature
Date