Rooftop Wind Turbine Installation Checklist
1. Pre-Installation Requirements
Site structural assessment completed
Wind resource analysis performed
Necessary permits and approvals obtained
Neighborhood/HOA approvals (if required)
Budget and funding confirmed
2. Roof Preparation
Roof inspected for structural integrity
Access to installation site confirmed
Clear area of obstacles/debris
Safety precautions in place
3. Equipment & Materials
Turbine system and mounting kit on site
Electrical wiring and cabling available
Safety gear available for crew
Required tools ready
4. Installation Process
Mounting system securely installed
Turbine assembled and mounted
Electrical connections completed
Grounding and lightning protection installed
System alignment and balance checked
5. Post-Installation
System performance tested
Inspection and sign-off by authorities
Documentation and manuals provided
Maintenance schedule discussed
Notes
Installer Signature