| Project Name | |
|---|---|
| Location | |
| Date | |
| Time | |
| Inspector/Supervisor |
| Advance warning signs installed at appropriate distances | |
| All traffic control devices on-site and ready | |
| Flaggers/trained personnel briefed on duties | |
| Communication established among crew and with dispatch | |
| Lane closure equipment inspected for defects | |
| Work zone lighting (if night work) operational |
| Tapers set up per regulatory standards | |
| Barricades/Cones/Drums properly positioned | |
| Arrow boards & signs in place and functioning | |
| Crash cushions and barriers deployed where required | |
| Pedestrian detours/ADA compliance ensured | |
| All signs visible and unobstructed |
| Periodic inspection of devices and signs | |
| Maintain two-way communication with crew | |
| Flaggers alert and position maintained | |
| Debris and hazards removed from lane/shoulder |
| All devices promptly and safely removed | |
| Check for left-behind tools or debris | |
| Restore all signs and striping (if affected) | |
| Confirm lane is safe before opening to traffic |