| Project Name | Date | ||
|---|---|---|---|
| Location | Inspector |
| Task | Completed | Comments |
|---|---|---|
| Verify plans and specs available onsite | ||
| Sub-floor/walls open for inspection | ||
| Pipe size and material checked | ||
| Drain, waste, and vent (DWV) routing verified | ||
| Water supply rough-in complete | ||
| Pipe slopes meet code requirements | ||
| Air or water pressure test performed | ||
| Pipe supports and hangers installed | ||
| Firestopping/sealing penetrations complete | ||
| Fixtures locations marked/blocked-in | ||
| Cleanouts accessible and installed | ||
| Shutoff valves accessible |