Electrical System Pre-Installation Checklist

General Information
Project Name Date
Location Inspector
Checklist
Item Yes No N/A Comments
All required permits and drawings are approved and available
Site free of hazards and accessible for electrical work
All electrical materials and equipment are on site
Equipment and materials inspected for defects/damage
Proper storage provided for electrical items
Clearances and mounting locations verified
Conduit and cable routes marked and unobstructed
Earthing/grounding locations identified
Power shutdown and lockout/tagout procedures in place
Coordination with other trades confirmed
Personal Protective Equipment (PPE) available
Additional Notes