| Inspection Item | Pass | Fail | N/A | Comments |
|---|---|---|---|---|
| PV Array Installation and Integrity | ||||
| Battery Installed as per Design | ||||
| Inverter/DC-AC Testing | ||||
| System Grounding Verified | ||||
| Monitoring/Communications Operational | ||||
| Labeling/Signage | ||||
| Shutdown & Safety Devices Verified | ||||
| Utility Interconnection Tested |