Erosion and Sediment Control Inspection Checklist

Project Name
Project Location
Inspector Name
Date
Site Conditions
Inspection Item Yes No N/A Comments/Actions Needed
Perimeter control measures in place and functioning
Construction exits/entrances free of sediment
Storm drain inlets protected
Stockpile areas properly protected
Control Measures
Inspection Item Yes No N/A Comments/Actions Needed
Sediment barriers (silt fence, wattles, etc.) properly installed
Drainage channels free of debris and sediment
Material storage areas protected from stormwater
Waste containers properly maintained
Corrective Actions Needed
Additional Comments
Inspector Signature
Date