| Item | Check | Notes |
|---|---|---|
| Area cleared of furniture and debris | ||
| Subfloor clean, dry, and level | ||
| Moisture levels within manufacturer specs | ||
| Flooring materials inspected for defects |
| Item | Check | Notes |
|---|---|---|
| Correct adhesive and installation methods used | ||
| Expansion gaps provided as required | ||
| Seams tight and properly aligned | ||
| Transitions and trims properly installed |
| Item | Check | Notes |
|---|---|---|
| Flooring surface clean and free of debris | ||
| No damage or visible defects | ||
| All tools and materials removed | ||
| Client walkthrough completed |