Plumbing Rough-In Quality Control Form
Project Name
Location
Date
Inspector
Rough-In Inspection Checklist
Item
Yes
No
N/A
Comments
Piping routes per plan and code
Pipe supports/brackets installed
Pipe pressure/leak test completed
Penetrations fire caulked as required
Drain/supply connections correct
Fixture locations verified
Vents installed and routed correctly
Piping insulated where required
Other Comments or Observations
Sign Off
Inspector Signature
Date