HVAC Installation Quality Assurance Checklist

Project Name Date
Project Address Inspector
Contractor System Type
1. Pre-Installation
Inspection Item Yes No Comments
Site conditions checked
Equipment delivered and inspected
Required materials available
2. Equipment Installation
Inspection Item Yes No Comments
Unit level and secure
Proper clearance maintained
Dampers and access panels installed
3. Ductwork Installation
Inspection Item Yes No Comments
Ducts supported and sealed
Insulation installed as specified
Vents and grilles installed
4. Electrical & Controls
Inspection Item Yes No Comments
Wiring secure and terminated
Breaker/fuses installed
Controls operational
5. Refrigerant Piping
Inspection Item Yes No Comments
Pipe runs installed correctly
Brazed joints/leak checked
Piping insulated
6. Drainage
Inspection Item Yes No Comments
Drain lines sloped and secure
Trap installed if required
No leaks observed
7. Startup & Testing
Inspection Item Yes No Comments
System started and operating
Pressure/temperature checked
Noise/vibration acceptable
Additional Comments
Inspector Signature
Date